How long does a roof replacement take?

Most roof replacements in the Tri-Cities take one to two days of work on the roof. A typical asphalt shingle home gets torn off in the morning, dried in the same day, and finished that afternoon or the next. Big roofs, steep pitches, rotten decking and weather can stretch that to three days or more.

How long does a roof replacement take on an average house?

A roof replacement on an average house takes one to two days from the first shingle coming off to the last ridge cap going on. GAF says an asphalt shingle replacement on an average-sized home can often be completed in one to two days, and IKO gives the same range. That matches what we see on most jobs in Richland and Kennewick.

Here’s roughly how a one-day job breaks down for us:

  1. Early morning: crew arrives, dumpster and materials are staged, cars are out of the driveway.
  2. Tear-off: old shingles, underlayment and flashing come off down to the wood deck. GAF says this usually takes a few hours.
  3. Deck check: we walk the whole deck and replace any soft or rotten sheathing.
  4. Dry-in: ice shield where it’s needed, drip edge, new underlayment, new flashing at pipes, walls and valleys.
  5. Shingles: starter strip, field shingles, ridge vent and ridge caps.
  6. Cleanup: nails get picked up with magnets, gutters get cleaned out, the dumpster leaves.

Add a second day if the roof is large or cut up, and a third if we’re waiting on weather. So if you’re asking how long does a roof replacement take on your house, the quick answer is one day for most ranches and two for most two-story homes.

What makes a roof replacement take longer?

A roof replacement takes longer when the roof is bigger, steeper, more cut up, or hiding damage under the shingles. Those four things explain almost every job that runs past a day.

Factor What it does to the schedule
Roof size The biggest factor. A 1,500 square foot ranch and a 4,000 square foot two-story are very different days.
Pitch GAF notes that roofs steeper than 8:12 need extra safety gear and slower work.
Complexity Lots of valleys, dormers, skylights and pipe penetrations mean more cuts and more flashing.
Rotten decking GAF says replacing bad sheathing adds anywhere from a few hours to an extra day.
Material Tile, slate and standing seam metal install slower than asphalt shingles.

We can’t see the deck until the shingles are off. If your roof has had a slow leak for a couple of seasons, plan on some sheathing getting replaced. We’ll show you the bad boards first.

Does Eastern Washington weather slow down a roof replacement?

Eastern Washington weather slows down a roof replacement less than almost anywhere in the state, but heat, wind and winter cold each change how we work. The area gets under seven inches of rain a year, so rain delays are rare compared to the west side. The things that move our schedule here are different.

Summer heat. Average July highs run around 89 degrees and the roof surface is a lot hotter than the air. GAF tells installers to keep bundles in the shade and wear soft-soled shoes so hot shingles don’t scuff. On the hottest days we start early and may knock off early rather than walk on soft shingles all afternoon. That can turn a one-day job into a day and a half.

Wind. Spring and fall are breezy here, with the occasional windstorm. We won’t tear off more than we can dry in before a wind event, and in dusty, windy spots GAF recommends hand-sealing shingles so the adhesive strip bonds. Hand-sealing adds time, but it’s the right call on exposed lots.

Winter cold. Monthly lows sit around 28 to 31 degrees from December through February. Shingles are stiffer when cold, and GAF says the sealant strip may not activate without enough heat, which again means hand-sealing. Frost on the deck is a safety problem, so winter crews often start later in the morning. Winter roofs get done here all the time. They just take more planning.

How long does the whole process take, from estimate to finished roof?

The whole process usually takes a few weeks from your first call to a finished roof, even though the work on the roof is one to two days. Most of that time is scheduling and materials, not labor.

  1. Free inspection and estimate. We get on the roof, measure, check the attic ventilation and walk you through options. You can get a ballpark first on our Roof Replacement Cost in Tri-Cities, WA page before we even come out.
  2. Pick your shingle and color, sign, and sort out payment. If you’re spreading the cost out, our Roof Financing in Tri-Cities, WA page explains how that works.
  3. Materials get ordered and a crew date gets set. Lead time depends on the shingle, the color and how booked we are.
  4. Install day. One to two days on most homes.
  5. Final walkthrough. We do a last magnet sweep and check the gutters and yard with you.

Richland has its own re-roof handout for asphalt shingles that calls for metal drip edge around the whole perimeter and ice shield in the eave area, with ice shield not required on slopes of 6:12 or steeper. We build to that on every job, so it doesn’t add time.

What should you do to help the job go faster?

You can help the job go faster by clearing the driveway, the yard and the attic before the crew arrives.

  • Move cars out of the driveway the night before. The dumpster and shingle delivery need that space.
  • Take pictures and fragile items off the walls. Tear-off shakes the whole house.
  • Cover anything stored in the attic. Dust and small debris fall through the deck gaps.
  • Move patio furniture, grills and potted plants away from the house.
  • Plan for pets and kids to be somewhere quieter during tear-off. It’s loud.
  • Unlock gates and point out sprinkler heads and anything we shouldn’t drive over.

Ready to find out how long your roof will take?

Book a free roof inspection and we’ll tell you what your roof needs, how many days it’ll take and what it’ll cost. Comfort IQ Roofing & Exteriors is a GAF Certified Contractor with a workmanship guarantee, financing available and a military discount. Our office is at 3121 Leslie Rd Ste 123 in Richland, and you can reach us at (509) 475-0515 or through our Roof Replacement in Richland, WA page.

Get your free roof quote

Takes about 30 seconds. No obligation.

Step 1 of 4

What do you need help with?

GAF Certified PlusLicensed and insuredLocal Tri-Cities team

Keep Reading

Two hip ridges running together on a Tri-Cities roof replacement in Pasco with Owens Corning Duration Premium AR

How long does a roof replacement take?

Most roof replacements in the Tri-Cities take one to two days on the roof, with size, pitch, decking repairs and weather deciding whether yours runs longer.